Design · Manufacture · Installation — Wellingborough, Northamptonshire

Get a quote

How we work

It starts with someone coming to look at it.

Every good sign we have made began the same way — a free site visit, a tape measure and a conversation about what the building is trying to say. Call us and we will book one this week.

Call 01933 449099Arrange a visit

01 / Getting started

Three ways in.
One of them is quickest.

You will speak to someone who surveys and specifies signage for a living, not a call handler reading from a script. If we are on site, leave a message and you will get a call back the same day.

001 · Fastest

Pick up the phone.

Two minutes on the phone usually settles what would take four emails. Tell us the address and roughly what you want above the door.

01933 449099Mon–Fru 8:30–17:00
002 · Easiest

Send us a photograph.

A phone photo of the frontage, the van or the glazing is enough for us to come back with options and a budget range.

Send a photoFiles up to 50MB, or send a link
003 · Best

Book a site visit.

We measure, check the substrate and the power, photograph the access and the sightlines, then design against what is actually there.

Arrange a visitUsually within two working days

02 / The visit

Forty-five minutes
that saves a fortnight.

Almost every signage problem we get called in to fix — a tray that will not sit flat, letters drilled into the wrong course, a lightbox with no supply behind it — traces back to a job that was quoted from a photograph. So we come and look.

Here is exactly what gets checked while we are there.

Checking a fascia panel fixing on site
  1. 01Measure the elevationHeight, width, brick courses, the depth of the reveal and where the existing fixings sit.
  2. 02Test the substrateRender, brick, timber, curtain walling or cladding all take a different fixing — and a different weight.
  3. 03Find the powerWhere the supply is, whether it is switched, and what an electrician will need to do before we arrive.
  4. 04Walk the sightlinesHow far away the sign has to be readable from, and what the street lighting does to it after dark.
  5. 05Check the accessWhether a tower will do, whether we need a MEWP, and where it can legally stand on the day.
  6. 06Note the consentsListed building, conservation area, projecting over a highway — we identify what needs consent before you commit.

03 / The sequence

Survey to switch-on, without a handover gap.

001

Survey

We come to you, measure the building and write the specification from what is there.

002

Design

Your sign drawn to scale on a photograph of your own elevation, with materials and fixings listed.

003

Quote

A fixed price — manufacture, access equipment, consent work, fixings and installation, itemised.

004

Make

Printed, routed, folded, wired and finished at Rixon Road. Illuminated work is tested on the bench.

005

Install & aftercare

Our own fitters, our own RAMS, handover photographs and a warranty you can call on.

04 / What comes back

A quotation you
can actually compare.

Signage quotes are notoriously hard to compare because half of them hide the access equipment and the consent work. Ours lists everything, so if you are getting three prices you can put them side by side.

Scaled artwork prepared for approval
A scaled visual on your own buildingPDF, same for every option
Materials, finish and colour referencesRAL / Pantone named
Fixing detail and substrate notesPer elevation
Illumination spec and running costWhere it applies
Access equipment and traffic managementIncluded in the price
Advertisement consent assessmentFlagged before you commit
Lead time we hold toFrom written approval

Nothing is cut, printed or fabricated until you approve the drawing in writing.

05 / Before you call

The questions
everybody asks.

Does the site visit cost anything?

No. The survey is free and there is no obligation attached to it. We would rather spend an hour measuring than quote something that turns out not to fit.

How quickly can someone come out?

Usually within two working days across Northamptonshire, Bedfordshire, Buckinghamshire and the surrounding counties. For national rollouts we plan a survey run rather than individual visits.

What do you need from me on the day?

Access to the frontage and, if the sign will be lit, some idea of where the electrical supply is. If you are a tenant, it helps to know who the landlord is — consent often runs through them.

I only have a photo — is that enough to start?

Enough to give you options and a budget range, yes. We will not issue a fixed price off a photograph, because the fixing and the substrate are the two things a photo cannot tell us.

How long from saying yes to a sign on the wall?

Typically two to five weeks from written artwork approval, depending on the build. Vinyl and safety signage can be days. Advertisement consent, where it is needed, adds around eight weeks — we tell you at survey, not later.

Do you work outside trading hours?

Routinely. Retail units and occupied offices are usually fitted at night or on a Sunday, and we do not charge a premium for it.

Book the visit

One call and someone is out to you this week.

01933 449099

Lines open

Mon–Fri 8:30–17:00

Or email

info@thesignhub.net

The workshop

61-65 Rixon Road, Finedon Road Industrial Estate, Wellingborough, Northants NN8 4BA

Arrange a consultationSee what we have built

Crafting signs